The Krasnosilka secondary school of I-III degrees, which is located in the centre of the amalgamated hromada, is being repaired now.
As reported by the Odesa Local Government Development Centre, established with the support of the U-LEAD with Europe Programme and MinRegion, the institution has already been equipped with energy-efficient windows and doors; the floor, ceiling, and bathrooms have been renovated; the heating and sewage systems, electrical wiring have been completely replaced; the fire-fighting system has also been renewed, and the assembly hall has been repaired. A lift for people with disabilities is made at the entrance instead of a ramp.
Now workers are warming facades, carring out internal repairs of the third, second and partially the first floors, in particular - of the dining room.
The full version is available in Ukrainian – please click HERE
Attached images:
Tags:
Область:
Одеська областьГромади:
Красносільська сільська об’єднана територіальна громадаSource:
Одеський Центр розвитку місцевого самоврядування
13 March 2026
Вінниччина розпочинає стратегічне партнерство з...
рація започаткувала довгострокове партнерство з німецькою землею Рейнланд-Пфальц. Меморандум про співробітництво...
13 March 2026
Учні 9-х класів можуть завершити школу без зміни закладу освіти
Учні 9-х класів можуть завершити школу без...
Учні 9-х класів можуть за власним бажанням завершити навчання в рідній школі, без необхідності переходити до іншого...
13 March 2026
Стартувала сьома Навчальна платформа для керівників ЦНАП
Стартувала сьома Навчальна платформа для...
5 березня 2026 року розпочалося навчання сьомої Навчальної платформи для керівників ЦНАП, що реалізується у...
13 March 2026
Understanding EU Structural Funds through their Potential Transformation
Understanding EU Structural Funds through their...
The European Union is gearing up for its next long-term budget cycle, the Multiannual Financial Framework for...